Here is a full bathroom re-fit carried out recently.
Starting with a blank canvas as the customer had had the room emptied and re-plastered. Firstly the floor boards were removed to allow all plumbing work to be concealed and to allow for some strengthening of the joists before the new floor boards where laid and a layer of plywood laid over that.
A shower enclosure and base were built to provide a spacious shower area with twin shower heads,

the corner of the room was boxed out to allow the toilet to be positioned at an angle

and a section of the wall where the bath was to be fitted was also boxed out to provide a shelf area behind the bath and to allow for the plumbing for the bath filler.

Also a new large radiator panel was fitted to heat the area.

The shower enclosure was then fully tanked using a waterproof membrane,

then the basin and mirror were fitted and the tiling was completed.
My work here is now complete and the finishing touches were being carried out by the customer.