Here is another wetroom conversion
This job was a full rip out of the existing shower suite and conversion to a wetroom.
The room was fully tiled so the first job was to remove the suite and tiles.
To my surprise as I stripped the tiles I found one wall had been tiled on tile.
Large portions of the plaster came off with the tiles so the next jobs were fitting the floor and dry lining the walls.
The wet deck and drain go in with the floor.
A new ceiling and spot lights were also fitted along with a new extractor fan.
Then the tanking system was installed.
And now the real work can start, the walls and floor get tiled.
And then the finishing touches, the sink, toilet, shower and screen and a large chrome towel warmer.